ผลงานโครงการ
Highway Construction Project, Lampang Bypass Road
Highway Construction Project, Highway No. 1211 (Suandok - Dongmada)
New Track Doubling Railway Project, Den Chai - Chiang Rai - Chiang Khong
Highway Construction Project, Highway No. 1388 (Huai Nam Khun - Doi Tung) KM. 5+300
Lampang Province – Slope stabilization for the Lampang bypass road using soil nails and shotcrete facing to secure the roadway and improve long-term stability.
Chiang Rai Province – Slope stabilization along Highway 1211 using soil nails and vegetated facing with geomaterials to control erosion and blend with the natural surroundings.
Chiang Rai Province – Foundation soil nailing beneath bridge footings to enhance bearing capacity and control settlement for long-term structural performance.
Chiang Rai Province (Doi Tung) – Construction of a Green Terramesh MSE wall with temporary soil nailing to stabilize steep slopes and protect the roadway corridor.
Highway Construction Project, Lampang Bypass Road (Soil Bag MSE Wall)
Highway Construction Project, Highway No. 1388 (Huai Nam Khun - Doi Tung) KM. 4+600 and KM.7+400
Highway Construction Project, Highway No. 1322 (Mae Ja - Rin Luang) KM.95+323
Highway Construction Project, Highway No. 103 (Rong Kwang - Ngao) Section 3
Lampang Province – Construction of a soil bag MSE wall (soil bags combined with geogrids) along the Lampang bypass road to support embankments and improve slope stability.
Chiang Rai Province (Doi Tung) – Temporary cut-slope stabilization using soil nails and horizontal drains installed behind the MSE wall to relieve groundwater pressure.
Chiang Mai Province – Temporary cut-slope stabilization using soil nails behind an existing gabion wall along Highway 1322 to prevent slope movement.
Lampang Province – Survey and detailed design for soil nail slope stabilization along Highway 103 to improve safety and long-term slope performance.